Statfjord A topside (~50,000 t) to be recycled at Aker Solutions Stord under Allseas contract
عرض بيع / مصدر خردة – Norway
Allseas picked Aker Solutions' Stord yard to break up the Statfjord A topside, one of the largest North Sea removals. Long-dated but very large steel/cable volume; European mills and offtake traders should approach Aker for future scrap offtake.
| Lead type | Sell offer / supply signal |
|---|---|
| Status | Live signal |
| Country | Norway · Stord |
| Organisation | Allseas / Aker Solutions |
| Counterparty | Equinor (field operator) |
| Materials (as described) | Offshore platform topside, approx. 50,000 tonnes, for dismantling and recycling |
| Quantity | ~50,000 t |
| Price / value | n/d |
| Announced | 17 Nov 2026 |
| Inspection | Arrival at Stord expected 2029-2031; ~2-year dismantling |
Materials المواد
- Plate & structural / demolition steel ألواح وهياكل حديدية / هدم (main)
- HMS 1&2 (heavy melting steel) حديد خردة ثقيل HMS (main)
- Insulated cable (Cu/Al) كابلات معزولة
- Used machinery & equipment آلات ومعدات مستعملة
What to do الخطوة التالية
Material is coming to market. Get on the seller's or contractor's bidder list early through the official route.
Compliance الامتثال
Hazardous material. Handling needs a licensed operator (in Saudi Arabia a MWAN waste-management licence; elsewhere the local environmental permit). Cross-border moves of hazardous waste fall under the Basel Convention (prior informed consent). Check export and import rules for each country involved. This is not legal advice.
Read the source → Official contact route Report a correction
Values marked n/d were not stated in the source. We don't publish personal phone numbers or emails.