Origin Energy files scoping report to decommission and demolish Eraring coal power station (closure Apr 2029)
عرض بيع / مصدر خردة – Australia
Australia's largest coal plant has started the approvals path for its demolition after the planned 2029 shutdown, so a large structural-steel and equipment dismantling package should follow. Demolition contractors and scrap processors in NSW should start building a relationship with Origin now.
| Lead type | Sell offer / supply signal |
|---|---|
| Status | Live signal |
| Country | Australia · Eraring (Lake Macquarie, NSW) |
| Organisation | Origin Energy |
| Materials (as described) | Demolition of power station site infrastructure incl. cooling water infrastructure; hazardous materials incl. coal ash |
| Quantity | n/d |
| Price / value | n/d |
| Announced | 14 Oct 2026 |
Materials المواد
- Plate & structural / demolition steel ألواح وهياكل حديدية / هدم (main)
- HMS 1&2 (heavy melting steel) حديد خردة ثقيل HMS (main)
- Used machinery & equipment آلات ومعدات مستعملة
- Transformers & switchgear محولات كهربائية ومفاتيح
What to do الخطوة التالية
Material is coming to market. Get on the seller's or contractor's bidder list early through the official route.
Compliance الامتثال
Hazardous material. transformers may hold oil with PCBs – get a PCB test certificate before buying or moving. Handling needs a licensed operator (in Saudi Arabia a MWAN waste-management licence; elsewhere the local environmental permit). Cross-border moves of hazardous waste fall under the Basel Convention (prior informed consent). Check export and import rules for each country involved. This is not legal advice.
Read the source → Official contact route Report a correction
Values marked n/d were not stated in the source. We don't publish personal phone numbers or emails.