Hindalco 50,000 t/yr copper & e-waste recycling plant at Pakhajan due Dec 2026; tripling to 150,000 t/yr under review
مشروع قادم – India
Hindalco's new Gujarat copper and e-waste recycling plant is due to start in December and may be scaled up threefold. GCC copper and PCB exporters should line up supply talks now.
| Lead type | Project signal |
|---|---|
| Status | Live signal |
| Country | India · Pakhajan, Gujarat |
| Organisation | Hindalco Industries |
| Materials (as described) | Copper scrap and e-waste feed for a new recycling plant |
| Quantity | 50,000 t/yr (possible 150,000 t/yr) |
| Price / value | n/d |
| Announced | 13 Nov 2026 |
Materials المواد
- Copper #2 (birch/cliff) نحاس رقم 2 (main)
- E-waste & PCBs نفايات إلكترونية ولوحات (main)
- Copper cable & wire (bare) كابلات وأسلاك نحاس
- Insulated cable (Cu/Al) كابلات معزولة
What to do الخطوة التالية
A future buyer or scrap source. Register as a supplier or offtaker now, before contracts are placed.
Compliance الامتثال
Hazardous material. e-waste may contain hazardous parts and data-bearing devices (data-wipe certificate). Handling needs a licensed operator (in Saudi Arabia a MWAN waste-management licence; elsewhere the local environmental permit). Cross-border moves of hazardous waste fall under the Basel Convention (prior informed consent). Check export and import rules for each country involved. This is not legal advice.
Read the source → Official contact route Report a correction
Values marked n/d were not stated in the source. We don't publish personal phone numbers or emails.